|
|
|
Hot tub water testing and final check
These are the final steps of building a hot tub.
We now attach the exterior siding to the hot tub frame. The structural integrity of the portable hot tub is not dependent on the cabinet as it is with other manufacturers.
Hot Tub Final
Inspection
The 4 main steps in building a hot tub or spa: Fiberglass & Framing the hot tub Plumbing & Insulation for the jets Water Testing, Cabinet Instillation and the Hot Tub Final Inspection
|
|
More outdoor
resources: ©, Aloha Hot Tubs.com |