Hot tub information for consumers.

Aloha Hot Tubs

 

Hot tub water testing and final check

These are the final steps of building a hot tub.
 

Water Testing

We water test the hot tubs for over 3 hours to check for any microscopic leaks. Every hot tub is also completely function tested before it leaves, the factory



Cabinet Instillation

We now attach the exterior siding to the hot tub frame. The structural integrity of the portable hot tub is not dependent on the cabinet as it is with other manufacturers.

 

Hot Tub Final Inspection

Each hot tub is cleaned and inspected for quality assurance before leaving the warehouse. Then shipped directly to you.
 

 

The 4 main steps in building a hot tub or spa:

Vacuum Forming your hot tub

Fiberglass & Framing the hot tub

Plumbing & Insulation for the jets

Water Testing, Cabinet Instillation and the Hot Tub Final Inspection


 

 

Home Page

FAQ

How a hot tub is manufactured

Understanding the shipping of hot tubs

Hot Tub Options

Disclaimers

 
           
   

More outdoor resources:
All resources
Resources for swimming and backyards
Game tables
Backyard home stuff


Home designs
Home DIY

 

©, Aloha Hot Tubs.com
All rights reserved worldwide. The information on this site is our opinion only and should not be construed as professional advice.